Home › Standard
EN 14276-2
3 current listing(s) — 1 EU harmonised, 2 UK designated.
Free. One email when its cessation date is set, moves, or the
listing changes — instead of re-reading the whole annex every month.
Current listings
| Edition | List | Title | Presumption from | Withdrawal / cessation | |
|---|---|---|---|---|---|
| EN 14276-2:2007+A1:2011 | UK UK Pressure Equipment (designated) | Pressure equipment for refrigerating systems and heat pumps - Part 2: Piping - General requirements | 01/01/2021 | 10/08/2022 | source |
| EN 14276-2:2020 | EU Pressure Equipment Directive | Pressure equipment for refrigerating systems and heat pumps – Part 2: Piping – General requirements | source | ||
| EN 14276-2:2020 | UK UK Pressure Equipment (designated) | Pressure equipment for refrigerating systems and heat pumps - Part 2: Piping - General requirements | 26/08/2021 | source |
No recorded change events yet for this standard.
JSON: /api/v1/standard/en-14276-2.json
Weekly withdrawal alerts
Which harmonised standards lose presumption of conformity next — one short email every Monday. No spam, unsubscribe any time.